IBEW Local 1245 Pay Rates
Vacaville, CA · California (most) + Nevada (most) — outside line + PG&E · US
Covers California Outside Line Construction Agreement (jointly with Local 47) plus PG&E Physical Agreement. 5-year outside line deal runs June 2022 – May 2027.
Current rates
Source: California Outside Line Construction Agreement, Exhibit A · verified 2026-07-18
Historical rates
Base wage vs total package.Base wage is the hourly rate on your check. Total package adds health & welfare, pension, and other employer-paid contributions on top — it is not a higher wage rate.
Wage agreements step up mid-contract. Always confirm the current rate with your local before negotiating or accepting work.
Wage agreements step up mid-contract. Always confirm the current rate with your local before negotiating or accepting work.